PEB Corp Group projects executed by SmartBrix Construction in steel framing and modular construction. Seven documented builds in Colombia and Panama, with area, schedule, and location: from a 39,000 m² (about 420,000 sq ft) institutional headquarters to a hospital delivered in 30 days.
SmartBrix Construction publishes its projects with verifiable data. Portfolio projects belong to the PEB Corp Group and were executed by SmartBrix Construction with PEB Corp engineering. On some, the structure was fabricated at the group plant (NewCon Steel®, in operation since 2018); on others, the group only installed it.
350+
PEB Corp Group projects
15+
Years of experience
2
Countries with offices: Panama and Colombia
7
Documented cases here
02 · Documented cases
Seven projects with area, schedule, and location.
From a 39,000 m² institutional headquarters to a modular hospital delivered in 30 days: what was built, how fast, where, and with which system. A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule.
Swipe to see every column →
PEB Corp Group projects executed by SmartBrix Construction · published data
Project
Sector
Area
Schedule
City
Building system
Case file
Ministry of Defense (Ministerio de Defensa Nacional)
SmartBrix delivered this 39,000 m² institutional headquarters in Bogotá in 8 months; it is the flagship project in its portfolio. At this scale, design, fabrication, and erection have to move in step, and the turnkey model brought them under one contract with one point of responsibility. The project shows that steel framing works at institutional scale.
Universidad del Rosario, Sede Mutis and Sede Norte: 11,500 m² built in 100 days in Bogotá. With the academic calendar as the deadline, the structure arrived prefabricated and was dry-assembled. The project is the benchmark for the system's typical schedule: 3–5 months from foundations.
SmartBrix delivered 2,430 m² of hospital infrastructure in 30 days in Panama City, the shortest schedule in the documented portfolio. SmartBrix executed the construction with dry assembly, keeping on-site work to a minimum. For the healthcare sector, modular construction puts patient capacity into operation in weeks.
Education
Colegio Santa Luisa
Built area
2,500 m² (about 26,900 sq ft)
Delivery time
3 months
Location
Bogotá, Colombia
Building system
Steel framing
Construction
SmartBrix Construction
Engineering
PEB Corp
SmartBrix delivered 2,500 m² of school infrastructure in 3 months in Bogotá. The structure was prefabricated and dry-assembled, with less wet work than traditional construction. Together with Universidad del Rosario, the project extends the system's track record in the education sector.
Education · Bogotá, Colombia
Events · Bogotá, Colombia
Events
Centro de Eventos Autopista Norte
Built area
6,000 m² (about 64,600 sq ft)
Delivery time
3 months
Location
Bogotá, Colombia
Building system
Steel framing
Construction
SmartBrix Construction
Engineering
PEB Corp
SmartBrix built 6,000 m² of event space on Bogotá's Autopista Norte in 3 months. Event venues need open floor plans, and steel framing delivers long clear spans with no intermediate columns, with the structure fabricated off-site and dry-assembled on site.
SmartBrix delivered 2,900 m² of university space in 3 months in Barranquilla, in a Caribbean coastal climate. The 3-month schedule applies to this project; confirm your scope and schedule with SmartBrix Colombia.
Higher education · Barranquilla, Colombia
Phased construction · Panama City
Education
Colegio Bilingüe
Built area
1,100 m² (about 11,800 sq ft), 8 phases
Delivery time
3 months
Location
Panama City
Building system
Steel framing
Construction
SmartBrix Construction
Engineering
PEB Corp
SmartBrix built 1,100 m² in 8 phases in Panama City without interrupting classes. The structure for each phase was prefabricated and dry-assembled, and the school kept operating through the 3 months of construction. The case shows that industrialized construction by SmartBrix Panama can proceed inside an institution in full operation.
03 · Next project
A comparable case for your project.
Today, the teams that delivered these seven projects design in BIM and deliver turnkey projects in Colombia and Panama; coverage in Central America and the Caribbean is confirmed per location. Steel framing profiles are fabricated at the group's CNC plant (NewCon Steel®, Las Mañanitas · EMMA regime). If your project is a school, a university, a hospital, or an institutional headquarters, you will find a comparable case on this page, with its area, schedule, and location.
See both systems: steel framing for permanent buildings and modular construction for rapid deployment. You can also see who we are and how we operate within PEB Corp Group. For your project's schedule and budget, request a technical proposal. Reply within 24 business hours · technical proposal / quote in 48 h.
Frequently asked questions about the portfolio
Do you build projects similar to mine?
Most likely. The 350+ PEB Corp Group projects executed by SmartBrix Construction span education, healthcare, industrial and logistics, offices, housing, defense and institutional, events, and camps. They are built in steel framing for permanent buildings and in prefabricated modules when schedule is the priority. The seven cases on this page range from 1,100 m² to 39,000 m². Tell us your project's use, area, and location, and we'll reply with the right system and comparable cases.
What size projects does SmartBrix build?
SmartBrix Construction's seven documented projects range from Colegio Bilingüe (1,100 m², Panama City, built in 8 phases) to the Ministry of Defense headquarters (39,000 m², Bogotá, delivered in 8 months). They are part of the 350+ PEB Corp Group projects executed by SmartBrix Construction. A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule.
Can I visit a delivered project?
Yes. We coordinate visits to delivered projects in Bogotá and Panama City based on the sector you're interested in. Request a visit through the contact page or email us at info@smartbrix.com: our sales team will propose a date and project that fit your case.
What delivery schedules do you work with?
Modular projects: finished project delivered in 60–120 days; the Hospital Modular in Panama City (2,430 m²) was delivered in 30 days. Steel framing projects: typically 3–5 months from foundations; Universidad del Rosario (11,500 m²) was built in 100 days, and Colegio Santa Luisa (2,500 m²) in 3 months. A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule.