SmartBrix Construction delivers permanent cold-formed steel (CFS) buildings, typically in 3–5 months from foundations and up to 90% faster than traditional construction. The turnkey scope covers BIM design, CNC fabrication at the group plant, and erection on site.

Key facts · Steel framing 2026
  • Reference cost (steel structure only, MEP and civil works not included; Panama 2026 reference): 220–260 USD/m² (about 20–24 USD/sq ft) for 500 m² (about 5,400 sq ft) · 180–220 USD/m² (about 17–20 USD/sq ft) for 2,000 m² (about 21,500 sq ft) · 150–180 USD/m² (about 14–17 USD/sq ft) for 5,000 m² (about 53,800 sq ft).
  • Typical schedule: 3–5 months from foundations, up to 90% faster than traditional construction.
  • Material: cold-formed steel (LGS/CFS) with Zn-Al-Mg 275 g/m² coating and ±0.5 mm (±0.02 in) CNC fabrication tolerance.
  • Design codes: NSR-10 (Colombia) · REP-2021 (Panama) · IBC · AISI S100. Hurricane design verified per project up to 250 km/h (155 mph), Saffir-Simpson Category 4.
01 · The system

What is steel framing?

Steel framing, also called light-gauge steel (LGS) or cold-formed steel (CFS) framing, is a building system of cold-formed steel members with a Zn-Al-Mg coating. The members are dry-assembled into load-bearing walls, floor systems, and roof trusses. It is the primary line of SmartBrix Construction, historically marketed as Smart Framing. Today SmartBrix uses it for permanent buildings: industrial warehouses, schools and universities, hospitals, corporate offices, and housing.

The workflow is industrial from start to finish. Each project is modeled in BIM (Revit/IFC) with clash detection before fabrication. Members are produced at the group's CNC plant (NewCon Steel®, Las Mañanitas · EMMA regime) with a Zn-Al-Mg 275 g/m² coating and ±0.5 mm tolerance. They arrive on site cut, punched, and labeled, ready for dry erection with no curing time. Moving the work from the site to the plant is why the system is up to 90% faster than traditional construction. SmartBrix steel framing projects are typically delivered in 3–5 months from foundations.

SmartBrix Construction, the turnkey unit of PEB Corp Group, is a leading steel framing and modular construction company in Latin America: it has executed 350+ PEB Corp Group projects and has 15+ years of experience across Colombia, Panama, Central America, and the Caribbean. The system is used for industrial warehouses, schools and universities, and housing.

When a project needs immediate deployment or relocation (camps, temporary classrooms, or site offices), the complementary prefabricated modular construction line delivers the finished project in 60–120 days. For permanent buildings, steel framing is the primary line. See the delivered projects.

02 · Benefits

Six reasons to build with steel framing.

Measurable advantages of cold-formed steel over traditional wet construction (concrete and masonry).

  • 01
    Precision to ±0.5 mm

    The group plant CNC-cuts, punches, and labels every member to a ±0.5 mm fabrication tolerance.

  • 02
    Long clear spans, no intermediate columns

    Steel trusses open up the floor plan in industrial warehouses, classrooms, auditoriums, and retail spaces.

  • 03
    Hurricane design verified per project

    Up to 250 km/h (Category 4); suited to projects in the Caribbean and exposed coastal zones. The quoted wind speed is a design reference, not a universal building rating.

  • 04
    Corrosion protection for tropical climates

    The Zn-Al-Mg 275 g/m² coating protects the steel against corrosion in tropical and coastal environments.

  • 05
    Less weight, lower foundation loads

    The structure weighs less than a traditional concrete system, so foundations are designed for that lighter load.

  • 06
    Dry construction, less waste

    Erection involves no curing time and generates up to 30% less construction waste than traditional building.

Operator at the CNC roll-forming line in the group’s plant in Panama

LGS members cut and punched by CNC at the group plant (NewCon Steel®, Las Mañanitas · EMMA regime).

03 · Technical specifications

System data sheet.

Technical data for the steel framing system SmartBrix Construction builds with.

System
Cold-formed steel: light-gauge steel (LGS) / cold-formed steel (CFS)
Coating
Zn-Al-Mg 275 g/m² (ZM275 to EN 10346 / ZMM275 to ASTM A1046), resistant to tropical and coastal corrosion
Fabrication tolerance
±0.5 mm (CNC cutting and punching)
Wind design
Hurricane design verified per project up to 250 km/h (Saffir-Simpson Category 4)
Design codes
NSR-10 (Colombia) · REP-2021 (Panama) · IBC · RETIE (Colombian electrical code) · AISI S100
Typical schedule
3–5 months from foundations
Modeling
BIM (Revit / IFC), with clash detection before fabrication
Fabrication
Group CNC plant (NewCon Steel®), Centro Industrial PEB, Las Mañanitas, Panama City · EMMA regime · capacity of 20,000 m²/month (about 215,000 sq ft/month)

The profiles are manufactured by NewCon Steel®, the group’s manufacturer: see its LGS/CFS profiles and thicknesses and the engineering and AISI S100-16 cold-formed steel standards. Full system details are in the Steel Framing brochure (PDF, ES). You can also request a quote with your project data.

04 · Construction process

Eight steps, from engineering to handover.

The process SmartBrix Construction follows today on its steel framing projects.

  1. Design
    Structural engineering and BIM modeling (Revit / IFC)
    01
  2. Fabrication
    CNC-cut LGS members: Zn-Al-Mg 275 g/m² · ±0.5 mm
    02
  3. Foundations and slab pour
    Civil works (sitework and foundations) at the project site
    03
  4. Wall and truss erection
    Dry assembly of the load-bearing structure
    04
  5. Plumbing and electrical rough-in
    Plumbing and electrical systems (RETIE in Colombia)
    05
  6. Exterior cladding
    Building envelope and facade
    06
  7. Sheathing and structural panels
    Closing in the building with the panel system
    07
  8. Interior finishes and bathroom fixtures
    Final finishes and turnkey handover
    08
05 · Gallery

Steel framing on site.

Plant, foundations, structure, and cladding on real projects.

3D model 3D model of Colegio Santa Luisa (Bogotá), designed for steel framing construction
CNC plant Coil decoiler and roll-forming line at the group plant
Foundations Foundation slab pour on site
Housing Complete two-story steel framing home structure on a sloped lot, with Zn-Al-Mg coated steel members and roof
Utilities Plumbing and electrical rough-in inside a steel framing building structure
Cladding Exterior cladding of a building constructed with steel framing
06 · 2026 reference investment

How much does steel framing construction cost?

PEB Corp Group reference ranges by project size (steel structure only, MEP and civil works not included; Panama 2026 reference).

Steel structure per m² (steel structure only, MEP and civil works not included; Panama 2026 reference)
Project sizeUSD/m²Scope
500 m² project220–260Steel structure only, MEP and civil works not included; Panama 2026 reference
2,000 m² project180–220Steel structure only, MEP and civil works not included; Panama 2026 reference
5,000 m² project150–180Steel structure only, MEP and civil works not included; Panama 2026 reference

Budget reference: confirm currency, date, location and inclusions with a project quotation. Steel supply, foundations, MEP, finishes, transport and taxes are separate cost items unless the offer explicitly includes them.

Updated:

These ranges cover the reference structure: LGS members, engineering, and fabrication. A turnkey project can add civil works, MEP systems, cladding, finishes, and furnishings, so each one is quoted by scope. Request a technical proposal with your project's area, use, and location. Reply within 24 business hours · technical proposal / quote in 48 h.

07 · Built evidence

Steel framing projects.

Three of the 350+ PEB Corp Group projects executed by SmartBrix Construction, with area, schedule, and city. A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule.

Is your project in Colombia?

For a project in Colombia, review SmartBrix construction services in Colombia: support from Bogotá, Bogotá and Barranquilla references, site review and information needed for a quote.

08 · Frequently asked questions

Steel framing cost, schedule, and codes.

How much does steel framing cost per square meter in 2026?
As a 2026 PEB Corp Group reference, a steel framing structure costs approx. 220–260 USD/m² for 500 m² projects, 180–220 USD/m² for 2,000 m², and 150–180 USD/m² for 5,000 m² (steel structure only, MEP and civil works not included; Panama 2026 reference). The final figure depends on design, use, and location, so every turnkey project is quoted by scope: request a technical proposal. Reply within 24 business hours · technical proposal / quote in 48 h.
What advantages does steel framing have over traditional reinforced-concrete construction?
Steel framing is up to 90% faster than traditional construction. Erection is dry, with no curing time, and members arrive on site CNC-cut and punched to a ±0.5 mm tolerance. The structure also weighs less than a traditional concrete system, which reduces foundation loads. The system allows long clear spans with no intermediate columns and generates up to 30% less construction waste.
How does steel framing perform in tropical climates? Does it corrode?
The members are made of steel with a Zn-Al-Mg 275 g/m² coating, resistant to corrosion in tropical and coastal environments like those of Colombia, Panama, and the Caribbean. For that reason the system is used in permanent buildings across the region: schools, hospitals, industrial warehouses, offices, and housing. Hurricane design is also verified per project up to 250 km/h (Category 4). The quoted wind speed is a design reference, not a universal building rating. Site-specific calculations, exposure, anchorage, connections, and envelope requirements must be verified for each project.
Which building codes govern SmartBrix steel framing design?
Every project is designed and verified to the code of its jurisdiction: NSR-10 in Colombia, REP-2021 in Panama, and IBC (International Building Code) as the international reference. AISI S100 also applies to cold-formed steel, and RETIE to electrical systems in Colombia. The quality system is backed by PEB Corp Group's ISO 9001, 14001, 45001, and 37001 certifications.
How long does a steel framing project take?
A SmartBrix steel framing project typically takes 3 to 5 months from foundations. Portfolio references: Universidad del Rosario in Bogotá (11,500 m²) was delivered in 100 days, Colegio Santa Luisa (2,500 m²) in 3 months, and the Ministry of Defense (39,000 m²) in 8 months. The schedule for each building depends on its area, design, and location.

Related guide: Steel framing vs. modular construction: how to choose →

Your steel framing project, quoted by engineers.

Send your project's area, use, and location. Reply within 24 business hours · technical proposal / quote in 48 h.

Message us on WhatsApp
Get a quote WhatsApp